| June 12 versions include assessments of both initial design capacity (140,000 tpy) and maximum design capacity (400,000 tpy) |
Site Specific Studies on Clarington 01 Site - June 12, 2009
Natural Environment Impact Assessment – June 12, 2009
Geotechnical Investigation – June 12, 2009
Stage 2 Archaeological Assessment and Built Heritage – June 12, 2009
Acoustic Assessment – Technical Study – June 12, 2009
Visual Assessment Technical Study – June 12, 2009
Surface Water and Groundwater Assessment - Technical Study – June 12, 2009
Economic Assessment -Technical Study – June 12, 2009
Social/Cultural Assessment Technical Study – June 12, 2009
Facility Energy and Life Cycle Assessment – June 12, 2009
Traffic Assessment -Technical Study – June 12, 2009
Air Quality Assessment Technical Study – June 12, 2009
Site Specific Human Health and Ecological Risk Assessment Technical Study – June 12, 2009
Fate and Transport Modeling Appendices
Human Health Risk Assessment Appendices
Ecological Risk Assessment Appendices
Ambient Air Monitoring Assessment
Ambient Air Monitoring Assessment – June 15, 2009
Revised Ambient Air Monitoring Assessment – December 18, 2009

| Site-specific assessments for initial design capacity (140,000 tpy) only |
Site Specific Studies on Clarington 01 Site
Natural Environment Impact Assessment
Geotechnical Investigation
Stage 2 Archaeological Assessment and Built Heritage
Environmental Baseline Study
Acoustic Assessment – Technical Study
Visual Assessment Technical Study
Surface Water and Groundwater Assessment - Technical Study
Economic Assessment -Technical Study
Social/Cultural Assessment Technical Study
Facility Energy and Life Cycle Assessment
Traffic Assessment -Technical Study
Air Quality Assessment Technical Study
Site Specific Human Health and Ecological Risk Assessment Technical Study
Fate and Transport Modeling Appendices
Human Health Risk Assessment Appendices
Ecological Risk Assessment Appendices
|