Durham York Waste Study
It's your garbage. What do you want us to do with it?
 

ARCHIVE - Previous versions of draft EA documents

June 12 versions include assessments of both initial design capacity (140,000 tpy) and maximum design capacity (400,000 tpy)
The following documents are best viewed using Adobe Reader 8 or higher.
Please visit Adobe’s website to download the latest version.

Draft Environmental Assessment (EA) Study Document (June 12, 2009) Assessment of 140,000 tpy and 400,000 tpy design capacity

Draft Environmental Assessment (EA) Study Document (June 12, 2009) - Full Report
Section 1 – Cover Page and Table of Contents Introduction and Background
Section 2 – Identification of the Proponents
Section 3 – Statement of Purpose
Section 4 – Approved EA Terms of Reference Requirements
Section 5 – The Planning Process
Section 6 – The Study Area
Section 7 – “Alternatives to” the Undertaking
Section 8 – Evaluation of “Alternative methods” of Implementing the Undertaking
Section 9 – “Alternative methods” of Implementing the Undertaking – Vendor Identification Process
Section 10 – Identification and Description of the Undertaking
Section 11 – Assessment of the Undertaking
Section 12 – Changes to the EA
Section 13 – Commitments
Section 14 – Monitoring Program
Section 15 – Additional Approval Requirements
Section 16 – Consultation Summary
Section 17 – Closure
Section 18 – References
Appendices

Draft Environmental Assessment (EA) Study Document (May 25, 2009)
Assessment of initial design capacity of 140,000 tpy only

Draft Environmental Assessment (EA) Study Document (May 25, 2009) - Full Report
Section 1 – Cover Page and Table of Contents Introduction and Background
Section 2 – Identification of the Proponents
Section 3 – Statement of Purpose
Section 4 – Approved EA Terms of Reference Requirements
Section 5 – The Planning Process
Section 6 – The Study Area
Section 7 – “Alternatives to” the Undertaking
Section 8 – Evaluation of “Alternative methods” of Implementing the Undertaking
Section 9 – “Alternative methods” of Implementing the Undertaking – Vendor Identification Process
Section 10 – Identification and Description of the Undertaking
Section 11 – Assessment of the Undertaking
Section 12 – Changes to the EA
Section 13 – Commitments
Section 14 – Monitoring Program
Section 15 – Additional Approval Requirements
Section 16 – Consultation Summary
Section 17 – Closure
Section 18 – References
Appendices

Draft Interim EA Study Documentation (April, 2009) Sections 1-8 only

Cover Page and Table of Contents
Section 1 – Introduction and Background
Section 2 – Identification of the Proponents
Section 3 – Statement of Purpose
Section 4 – Approved EA Terms of Reference Requirements
Section 5 – The Planning Process
Section 6 – The Study Area
Section 7 – “Alternatives to” the Undertaking
Section 8 – Evaluation of “Alternative methods” of Implementing the Undertaking

 

Site-specific studies can be found here

www.durhamyorkwaste.ca
© Durham/York Residual Waste Study