Executive Summary
Step 7 Report: Executive Summary – Consultant’s Recommended Site
Report
Step 7 Report – Consultant’s Recommended Site
Appendices
Appendix A – Short-List Site Maps Appendix B – Documentation Supporting Revisions to Short-List
Annexes
Annex A – Report on Potential Air Quality Impacts Annex B – Report on Potential Water Quality Impacts (Surface Water & Groundwater) Annex C – Report on Potential Environmentally Sensitive Areas and Species Impacts and Aquatic and Terrestrial Ecology Impacts Annex D – Report on Compatibility with Existing and/or Proposed Land Uses Annex E – Report on Archaeological and Cultural Resources Annex F – Report on Potential Traffic Impacts Annex G – Report on Capital Costs and Operating and Maintenance Costs Annex H – Report on Compatibility with Existing Infrastructure & Design_Operational Flexibility Annex H – Appendices A & B Annex H - Appendices C, D & E Annex I – Report on Complexity of Required Approvals and Complexity of Required Agreements
Presentation
Thermal Facility Site Selection Process - Consultants Recomendation on the Preferred Site October 2007 If you have trouble viewing the video please download the latest QuickTime media player here: Download QuickTime Player
If you have trouble viewing the video please download the latest QuickTime media player here: Download QuickTime Player
Facilitator's Summary Reports and "I Didn't Get a Chance to Say" Q&As
October 3, 2007 Facilitator's Summary Report and "I Didn't Get a Chance to Say" Q&As (Durham) October 9, 2007 Facilitator's Summary Report and "I Didn't Get a Chance to Say" Q&As (Durham) October 23, 2007 Facilitator's Summary Report and "I Didn't Get a Chance to Say" Q&As (York)
October 23, 2007 Facilitator's Summary Report and "I Didn't Get a Chance to Say" Q&As (York)
Consultation Documents
Consultation Report on Consultants Recommended Site Appendices
Peer Review Comments
Comments received from Clarington Peer Reviews on the Step 7 Preferred Site Report